Start
>
Management measures
Start
About TIDE toolbox
Glossary
Management issues
TIDE tools
Reports
Management measures
Links
Disclaimer:
The authors are solely responsible for the content of this report. Material included herein does not represent the opinion of the European Community, and the European Community is not responsible for any use that might be made of it.
Back to overview measures
Lippenbroek: Flood Control Area with Controlled Reduced Tide (FCA-CRT)
Table of content
1.
Description of measure
1a.
Measure description
1b.
Monitoring
1c.
Monitoring results
2.
Execution of main effectiveness criteria
2a.
Effectiveness according to development targets of measure
2b.
Impact on ecosystem services
2c.
Degree of synergistic effects and conflicts according to uses
3.
Additional evaluation criteria in view of EU environmental law
3a.
Degree of synergistic effects and conflicts according to WFD aims
3b.
Degree of synergistic effects and conflicts according to Natura 2000 aims
4.
Crux of the matter
5.
References
Additional information
for this measure:
No further information available.
Download Full Measure
Download Measure Survey
Description of measure
Measure Category: Hydrology/Morphology; and Biology/Ecology
Estuary: Scheldt
Salinity zone: Limnic
Pressure: Gross change in morphology and hydrographic regime
Status: Implemented (since 2006)
River km: Scheldt-km 115-129, TIDE-km 31-45
Country: Belgium
Specific location: Sea Scheldt (Zeeschelde), Flanders, at the left bank of the Scheldt near Driegoten, Hamme
Responsible authority: Waterwegen en Zeekanaal NV
Costs: 1,000,000 €
Cost category: 1,000,000 – 5,000,000 €
Figure 1. Location of the FCA-CRT Lippenbroek
Figure 2. Air view of FCA-CRT Lippenbroek
Back to top
1a. Measure description
Important to know
Reports / Measures / Tools
Report:
Management measures analysis and comparison