The construction of a new current deflection wall within the harbor is planned by the HPA. In a side selection study two main criteria for the construction were identified: The wall should not alter the navigation conditions at the harbor basin entrances and has to be constructed in a way that they are on one hand strong enough to resist the pounding of the waves and on the other hand constructed as simple and therefore cheap as it can be.