Project part-financed by the European Union (European Regional Development Fund)

The Interreg IVB North Sea Region Programme


Disclaimer:
The authors are solely responsible for the content of this report. Material included herein does not represent the opinion of the European Community, and the European Community is not responsible for any use that might be made of it.
Back to overview measures



Compensation channel Hahnöfer Nebenelbe

Introduction

The measure “Hahnöfer Nebenelbe/A+E Rinne” was carried out in 2003 as a compensation measure for the fairway deepening (1999) in order to improve the ecological conditions of shallow water areas along the river. The aim was to develop and protect specific mudflat and shallow water habitats through dredging a channel in the area ‘Mühlenberger Loch’ and ‘Hahnöfer Nebenelbe’.


Back to top

Important to know

Reports / Measures / Tools

Report: Management measures analysis and comparison